Skip to content

[Draft] Initial environmental and social impact assessment (IESIA) on sand mining to create ship route and fill Kampot Special Economic Zone and Port project

The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.

Data Resources (16)

Data Resource Preview - Table of Content

Additional Info

Field Value
Geographic area (spatial range)
  • Cambodia
Topics
  • Environmental impact assessments
  • Mining
  • Special economic zones
Document type Environmental Impact Assessment
Contracting Parties
  • Kampot SEZ
Government Entity (multiple)
  • Ministry of Environment
  • Ministry of Land Management, Urban Planning and Construction
  • Ministry of Mines and Energy
  • Ministry of Water Resources and Meterology
License Creative Commons Attribution Share-Alike
Copyright No
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1
Language of document
  • Khmer
Province(s)
  • Kampot
Metadata Reference Information

Metadata last updated on 2021-07-07. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

Signature date April 10, 2010
Contact

CES CO., LTD Address: Phnom Penh, Cambodia. Phone: (855) 12 666 462 Email: info@ces.com.kh

Job creation summary

In this project, the company needs about 100 local workers and about 300 foreign workers.

Number of created jobs 400.0
Training summary

The company has educational programs for its employees and workers to understand environmental pollution and environmental beauty, such as: - Education on solid and liquid waste management: be careful when spilling or storing oil and pour waste only in designated containers. - Water pollution education: how to use machinery and equipment in a technical manner according to the location and time.

Environmental protection obligation

The general process of environmental management planning in the project area includes: - Data collection and analysis by the project owner or project consultant - Preparation of monthly, quarterly and annual reports made by the project owner or project consultant - Receipt of reports and implementation of inspections and suggestions for reports by the Ministry or Department of Environment and relevant institutions.

Environmental fund summary

The company plans to contribute to environmental resource restoration activities such as replanting mangrove trees in suitable locations, improving the quality of natural seagrass and natural grass planting, restoring coral planting systems in suitable locations, and conserving spawning grounds.

Total amount of environmental funds 3000000.0
Legacy reference document Draft_IESIA_Kamport_Port__10.04.2021.pdf
Keywords International Port,IEIA,Kampot Port,Kampot SEZ
Open Contracting Identifier ocds-miumsd-810cfa5c-314b-4b5c-bbb5-676fed97fe03
Date uploaded July 9, 2021, 06:59 (UTC)
Date modified October 5, 2022, 08:32 (UTC)