Skip to content

Se Kong- Se San and Nam Theun River Basins Hydropower Study

This document is the Appendix part of the final report study of Se Kong-Se San Nam Theun River Basins Hydropower. This document provides more detail information of Lower Se San 2, Lower Sre Pok 2, Nam Kong 1, Xe Kaman 3, Se San 4 and Upper Kontum projects with the Introduction, Scheme layout, Site information, Scheme design, Review of downstream site, Cost estimation, Reservoir operation and energy computation, Further work, and Social, environmental and watershed management studies.

Data Resources (1)

Data Resource Preview - Se Kong- Se San and Nam Theun River Basins Hydropower Study

Additional Info

Field Value
Document type Reports, journal articles, and research papers (including theses and dissertations)
Language of document
  • English
Geographic area (spatial range)
  • Cambodia
  • Viet Nam
  • Lao People's Democratic Republic
  • Thailand
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1.0
License CC-BY-SA-4.0
Contact

Halcrow Water Burderop Park Swindon Wiltshire SN4 OQD Tel+44 (0)1793 812479 Fax +44 (0)1793 812089 www. hakrow.com

Author (corporate) Asian Development Bank
Publisher Sir William Halcrow and Partners Ltd., UK in Association with EPDC International, Japan & MK Centennial, USA
Publication date 1999
Legacy reference document ADB_Final_Report__07.1999.pdf
Date uploaded July 15, 2016, 08:53 (UTC)
Date modified November 15, 2016, 09:47 (UTC)