Skip to content

Webpage capture on the news article of Royal Group to do study on 700MW power plant

Webpage capture on the article of Royal Group to do study on 700MW power plant briefs on the feasibility study on a 700-megawatt coal-fired power plant in Preah Sihanouk province. The article was posted by the Khmer Times on 18 June 2019.

Data Resources (1)

Data Resource Preview - Webpage capture on the article of Royal Group to do study on 700MW power plant

Additional Info

Field Value
Document type Archived web content
Language of document
  • English
Short title (alternative/varying form of title) 700MW power plant
Topics
  • Coal
  • Energy
  • Investment
Geographic area (spatial range)
  • Cambodia
Province(s)
  • Preah Sihanouk
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

Version / Edition 1
License

No license given

Contact

Khmer Times

Mail address: Lot#1381, National Road 2, Sangkat Chak Angre Krom, Khan Meanchey, Phnom Penh, Kingdom of Cambodia Tel: +855 23 881 591 / 691 Khmer website: https://www.khmertimeskh.com/category/khmer/ English website: https://www.khmertimeskh.com/

Author (individual) Chea Vannak
Author (corporate) Khmer Times
Publisher Khmer Times
Publication date 2019
General note

Link to the source: https://www.khmertimeskh.com/50614975/royal-group-to-do-study-on-700-mw-power-plant/ Link to the archived webpage: https://archive.fo/wBCun

Legacy reference document Royal_Group_700MW_power_plant__18.06.2019.pdf
Keywords Power Plant,Preah Sihanouk,Royal Group,Coal-fired Power
Date uploaded August 2, 2021, 04:08 (UTC)
Date modified February 7, 2022, 09:50 (UTC)