Skip to content

Webpage capture on​ construction of US$35 million Russey Keo bridge 89% complete

As of early December, the construction of the Russey Keo cable bridge across the Tonle Sap River has been 89% completed, according to the Department of Public Works and Transport of Phnom Penh on December 5. Worth US$35 million, the new concrete cable-stayed bridge across the Tonle Sap is 20.5 meters wide and 500 meters long. The project is scheduled to be completed in April 2023.

Data Resources (1)

Data Resource Preview - Webpage capture on​ Construction of US$35 million Russey Keo bridge 89%

Additional Info

Field Value
Document type Archived web content
Language of document
  • English
  • Khmer
Short title (alternative/varying form of title) Russey Keo bridge
Topics Investment
Geographic area (spatial range)
  • Cambodia
Province(s)
  • Phnom Penh
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

Version / Edition 1
License

No license given

Contact

Construction Property

Mail address: No. 315 (Canadia Tower - Floor 11th), St. Preah Monivong Blvd. corner of 110, 12202, Phnom Penh Tel: 060 888 944 / 077 811 168

Author (corporate) Construction Property
Publisher Construction Property
Publication date 2022
General note

Link to the source: https://construction-property.com/us35-million-russey-keo-bridge-is-89-percents-completed/ Link to the archived webpage: https://archive.ph/aDRfp

Legacy reference document Russey_Keo_bridge__05.12.2022.pdf
Keywords Bridge
Date uploaded September 20, 2023, 04:28 (UTC)
Date modified March 19, 2024, 07:51 (UTC)