-
Appendix (2)
The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.
Thông tin khác
Miền | Giá trị |
---|---|
Cập nhật lần cuối | 3 tháng 9, 2021 |
Được tạo ra | Không biết |
Định dạng | |
Giấy phép | Creative Commons Attribution Share-Alike |
Tên | Appendix (2) |
Các ngôn ngữ của tài nguyên |
|
Mô tả | The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port. |