-
Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project
The Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project, written by Electricité du Cambodge (EDC), aims to improve power supply by reinforcing transmission lines, substations and distribution lines in the Phnom Penh metropolitan area. This Preparatory Survey will review the necessity, feasibility, technical aspects of the construction of the transmission line and the distribution system in Phnom Penh which is to be proposed. It will analyze current conditions, the expansion of power plants and their transmission lines based on the load flow and short circuit study.
Thông tin khác
Miền | Giá trị |
---|---|
Cập nhật lần cuối | 15 tháng 5, 2024 |
Được tạo ra | Không biết |
Định dạng | |
Giấy phép | CC-BY-SA-4.0 |
Tên | Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project |
Mô tả |
The Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project, written by Electricité du Cambodge (EDC), aims to improve power supply by reinforcing transmission lines, substations and distribution lines in the Phnom Penh metropolitan area. This Preparatory Survey will review the necessity, feasibility, technical aspects of the construction of the transmission line and the distribution system in Phnom Penh which is to be proposed. It will analyze current conditions, the expansion of power plants and their transmission lines based on the load flow and short circuit study. |
Resource's languages |
|