-
Webpage capture on the news article of Samdech Techo Hun Sen inaugurated the opening of a cement factory in Battambang province.
This webpage capture talks about the Battambang Conch Cement factory is built on a site with a total area of 316 hectares and took 18 months to build since the end of 2016. The construction of the factory used an investment capital of approximately US$230 million, which is a joint investment between Conch International Holding (HK) Limited and Battambang KT Cement Co.,Ltd, represented by Oknha Si Kong Triv and Oknha Vinh Hour.
Thông tin khác
Miền | Giá trị |
---|---|
Cập nhật lần cuối | 15 tháng 1, 2025 |
Được tạo ra | Không biết |
Định dạng | |
Giấy phép | License not specified |
Tên | Webpage capture on the news article of Samdech Techo Hun Sen inaugurated the opening of a cement factory in Battambang province. |
Mô tả |
This webpage capture talks about the Battambang Conch Cement factory is built on a site with a total area of 316 hectares and took 18 months to build since the end of 2016. The construction of the factory used an investment capital of approximately US$230 million, which is a joint investment between Conch International Holding (HK) Limited and Battambang KT Cement Co.,Ltd, represented by Oknha Si Kong Triv and Oknha Vinh Hour. |
Resource's languages |
|