[Draft] Initial environmental impact assessment on 230kV high voltage transmission lines project from Stung Hav substation to the western substation of Phnom Penh
Published by: Open Development Cambodia
Data Resources (20)
Data Resource Preview - Table of contents
Thông tin khác
Miền | Giá trị |
---|---|
Vùng địa lý (phạm vi không gian) |
|
Chủ đề |
|
Loại tài liệu | Environmental Impact Assessment |
Các bên ký kết |
|
Đối tượng thuộc chính phủ (nhiều) |
|
Tên nhượng quyền/giấy phép | Co. 9452 / 07P |
Giấy phép | Creative Commons Attribution Share-Alike |
Bản quyền | No |
Hạn chế truy cập và sử dụng |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use. |
Phiên bản/ Ấn phẩm | 1 |
Ngôn ngữ của tài liệu |
|
(Các) Tỉnh |
|
Thông tin tham khảo Metadata. |
Metadata last updated on 2021-04-22. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia. |
Liên hệ |
Creative Green Design Co., Ltd Address: No. 322P, Street 271Z, Sangkat Terk Tla, Khan Resey Keo, Phnom Penh. Tel: (855-11)845 695/097 204 6789 Email: saphoeuntous09@yahoo.com/www.CREATIVE09.com |
Điều khoản hợp đồng | 99.0 |
Đơn vị điều khoản hợp đồng | Years |
Party's obligation in the implementation of the project |
Alex Corporation Co., LTD has invested US$ 119,146,000. The company has experience in the construction of coal-fired power lines and hydropower projects. The 230-kV transmission line project is proposed to build 426 power poles with a total length of 198 km. The company needs domestic and foreign labor force up to 300 to 400 people, of which 10% are foreign workers. |
Job creation summary |
This transmission line project provides job opportunities and income: - During the construction phase, some people may be selected to work as construction workers according to their professional level. - It is easy to do business because when there is enough electricity, people can sell at night, can travel at night, and sales grow more than before. |
Số lượng công việc được tạo | 400.0 |
Training summary |
The required domestic and foreign labor force is 300 to 400 people, of which 10% are foreign workers. |
Environmental protection obligation |
During the construction phase, a number of construction activities, such as land clearing, land reclamation, construction of workers' shelters, transportation of materials, etc., may affect physical, biological and socio-economic. Measures to reduce some of the side effects are identified as well. |
Socio-cultural protection |
The 230 kV transmission line project will affect 1,318 households in 3 provinces, 7 districts and 19 communes. The study on compensation costs varies from region to region and from village to village. The company will have a plan to deal with these affected plots of land and dwellings, with compensation based on actual costs. According to the results of the compensation, the company has settled for the people in Kampong Speu about 22 percent, Sihanoukville 100 percent, and Koh Kong 100 percent. |
Tài liệu tham khảo kế thừa | Draft_EIA_Alex_Corporation__00.00.2016.pdf |
Các từ khóa | Power Transmission Lines Project,Alex Corporation,electricity line |
Định danh hợp đồng mở | ocds-miumsd-b7c4c7fb-39fa-4993-8124-854b489757cc |
Ngày đăng tải | tháng 7 15, 2021, 03:24 (UTC) |
Ngày chỉnh sửa, cập nhật | tháng 9 23, 2021, 13:46 (UTC) |