Đi thẳng đến nội dung

[Draft] Environmental Impact Assessment: Cambodia Block A Development

Chevron Overseas Petroleum (Cambodia) plans to develop the Apsara field in the Block A concession, which is 4 709 square km in area and located approximately 157 km offshore from the Cambodian mainland. The scope of this EIA study is Phase 1 of the Block A development project including the initial production and processing platform, potential development of three additional platforms and potential development of the remaining six platforms. After receiving the license in 2002, 18 wells have been drilled.

Data Resources (6)

Data Resource Preview - Environmental Impact Assessment: Cambodia Block A Development (Part 1)

Thông tin khác

Miền Giá trị
Vùng địa lý (phạm vi không gian)
  • Campuchia
Chủ đề
  • Extractive industries
  • Off-shore oil and gas exploration and extraction
  • Oil and gas resources
Loại tài liệu Environmental Impact Assessment
Các bên ký kết
  • Agro Star Investment
  • Cambodia Hai Lan Mineral Co. Ltd.
  • Chevron Overseas Petroleum (Cambodia) Limited
Đối tượng thuộc chính phủ (nhiều)
  • Minister of Environment
  • Minister of Mines and Energy
  • Thủ tướng
Chế dộ tiết lộ Released by local non-governmental organizations (LNGOs)
Giấy phép CC-BY-SA-4.0
Bản quyền To be determined
Hạn chế truy cập và sử dụng

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Phiên bản/ Ấn phẩm 1
Ngôn ngữ của tài liệu
  • Tiếng Anh
  • Tiếng Khmer
(Các) Tỉnh
  • Banteay Meanchey
  • Preah Sihanouk
Thông tin tham khảo Metadata.

Metadata last updated on 2018-05-03. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

Liên hệ

International Environmental Management Co. Ldt. (IEM)

Address: Bangkok (Head Office)​ 8th Floor, Sitthivorakit Building, 5 Soi Pipat, Silom Road, Bangrak, Bangkok 10500, Thailand. Tel: (66-2) 636.6390-9, 636.6683-4, Fax: (66-2) 236-6276, E-mail: ron@iem-global.com

Khu vực được cấp phép 470900.0
Quy hoạch sử dụng đất Year 0, Platform A Installation, Drilling and Hook up and commissioning service (HUC); Year 3, Installation, Drilling and HUC B; Year 4, Installation, Drilling and HUC C; Year 4, Installation, Drilling and HUC D; Year 5, Installation, Drilling and HUC E; Year 5, Installation, Drilling and HUC F; Year 6, Installation, Drilling and HUC G; Year 7, Installation, Drilling and HUC H; Year 8, Installation, Drilling and HUC I; Year 9, Installation, Drilling and HUC J3
Đơn vị quy hoạch sử dụng đất Ha
Job creation summary

Core operations require 50 people during phase 1 a. Approximately 30 people total will be needed to run the ship and 20 people total to run the facilities. Additional personnel may be required for Phase 1 c. Where appropriate, the use of local business firms and employees will be a priority for Chevron and partners.

Số lượng công việc được tạo 50.0
Environmental protection obligation

Environmental monitoring measures will be taken to verify the effectiveness of mitigation measure on various aspects such as seawater and sediment, fishing, tourism, air quality, rare and endangered species, greenhouse gas emission, under water noise, drill cutting and mud, waste generation, and benthos.

Dự án liên quan

Oil and Gas Block A: https://opendevelopmentcambodia.net/en/profiles/oil-and-gas-blocks/?feature_id=27

Tài liệu tham khảo kế thừa Draft_EIA_report_Cheveron__00.03.2012.pdf
Định danh hợp đồng mở ocds-miumsd-b77e2ed5-64c3-4fd9-a706-76c8a82792ba
Ngày đăng tải tháng 11 1, 2018, 02:35 (UTC)
Ngày chỉnh sửa, cập nhật tháng 9 27, 2021, 04:34 (UTC)