Đi thẳng đến nội dung

Hydropower sector review for the Joint Basin planning process

The Basin Development Plan Phase 2 (BDP2) is designed to provide an integrated basin perspective through the participatory development of a rolling Integrated Water Resources Management (IWRM) based Basin Development Plan. The preparation of the Plan will bring all existing, planned and potential water and related resources development projects in a joint basin planning process, through a combination of sub-basin and sector activities,and a basin-wide integrated assessment framework. This offers an integrative platform for the Mekong River Commission (MRC)to engage in transboundary assessment and multi-stakeholder consultation to facilitate a broad and informed dialogue on sustainable water resources development and management.

Data Resources (2)

Data Resource Preview - Hydropower sector review for the Joint Basin planning process

Thông tin khác

Miền Giá trị
Loại tài liệu Reports, journal articles, and research papers (including theses and dissertations)
Ngôn ngữ
  • Tiếng Anh
Chủ đề
  • Hydropower dams
  • Rivers and lakes
Vùng địa lý (phạm vi không gian)
  • Campuchia
  • Lao People's Democratic Republic
  • Thái Lan
  • Viet Nam
Bản quyền Yes
Hạn chế truy cập và sử dụng

All information posted on the MRC website www.mrcmekong.org is publicly available and may be used for non-profit activities, namely research, provided the MRC is properly accredited. Prior permission need not be sought.

Phiên bản/Lần xuất bản 1
Giấy phép unspecified
Liên hệ

Mekong River Commision P.O Box 6101, Vientiane, Lao PDR Tel: (856) 21 263 263 Fax: (856) 21 263 264 Email: mrce@mrcmekong.org

Tác giả (cá nhân) Mekong River Commission
Nơi xuất bản Laos
Nhà xuất bản Mekong River Commission
Ngày xuất bản 2009
Đánh số trang 44
Các từ khóa Mekong River,integrated water resources management,Lower Mekong Basin
Ngày đăng tải tháng 11 21, 2017, 09:43 (UTC)
Ngày chỉnh sửa, cập nhật tháng 6 18, 2018, 05:05 (UTC)