Đi thẳng đến nội dung

Webpage capture on Siem Reap 38-road project sees progress during tourism lull

The 38-road project in Siem Reap is seeing significant progress since its groundbreaking in late November 2020. The infrastructure project is constructing and rehabilitating roads in the city along with building and repairing rainwater drainage and wastewater purification systems.

Data Resources (1)

Data Resource Preview - Webpage capture on Siem Reap 38-road project sees progress during tourism lull

Thông tin khác

Miền Giá trị
Loại tài liệu Archived web content
Ngôn ngữ
  • Tiếng Anh
Tên rút gọn (tên thay thế/dạng viết khác) Siem Reap 38-road project
Chủ đề
  • Infrastructure
  • Investment
Vùng địa lý (phạm vi không gian)
  • Campuchia
Các (Tỉnh)
  • Siem Reap
Bản quyền Yes
Hạn chế truy cập và sử dụng

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Phiên bản/Lần xuất bản 1
Giấy phép Attribution-NonCommercial-ShareAlike 3.0 IGO (CC BY-NC-SA 3.0 IGO)
Liên hệ

Realestate.com.kh

Mail address: Corner Street 302 and Street 63 Sangkat Boeng Keng Kang Ti Muoy, Phnom Penh 12302 Tel: +855 92 92 1000 Website: https://www.realestate.com.kh/

Tác giả (tổ chức) Realestate.com.kh
Nhà xuất bản Realestate.com.kh
Ngày xuất bản 2021
Chú ý

Link to the source: https://www.realestate.com.kh/news/siem-reap-38-road-project-progress-january-2021/ Link to the archived webpage: https://archive.ph/kJ6Dy

Văn bản pháp luật liên quan SiemReap_38roads_ project__04.02.2021.pdf
Các từ khóa 38 road project,Siem Reap
Ngày đăng tải tháng 8 18, 2021, 08:35 (UTC)
Ngày chỉnh sửa, cập nhật tháng 1 12, 2022, 07:49 (UTC)