Đi thẳng đến nội dung

Webpage capture on the news article of Royal Group to do study on 700MW power plant

Webpage capture on the article of Royal Group to do study on 700MW power plant briefs on the feasibility study on a 700-megawatt coal-fired power plant in Preah Sihanouk province. The article was posted by the Khmer Times on 18 June 2019.

Data Resources (1)

Data Resource Preview - Webpage capture on the article of Royal Group to do study on 700MW power plant

Thông tin khác

Miền Giá trị
Loại tài liệu Archived web content
Ngôn ngữ
  • Tiếng Anh
Tên rút gọn (tên thay thế/dạng viết khác) 700MW power plant
Chủ đề
  • Coal
  • Energy
  • Investment
Vùng địa lý (phạm vi không gian)
  • Campuchia
Các (Tỉnh)
  • Preah Sihanouk
Bản quyền Yes
Hạn chế truy cập và sử dụng

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

Phiên bản/Lần xuất bản 1
Giấy phép

No license given

Liên hệ

Khmer Times

Mail address: Lot#1381, National Road 2, Sangkat Chak Angre Krom, Khan Meanchey, Phnom Penh, Kingdom of Cambodia Tel: +855 23 881 591 / 691 Khmer website: https://www.khmertimeskh.com/category/khmer/ English website: https://www.khmertimeskh.com/

Tác giả (cá nhân) Chea Vannak
Tác giả (tổ chức) Khmer Times
Nhà xuất bản Khmer Times
Ngày xuất bản 2019
Chú ý

Link to the source: https://www.khmertimeskh.com/50614975/royal-group-to-do-study-on-700-mw-power-plant/ Link to the archived webpage: https://archive.fo/wBCun

Văn bản pháp luật liên quan Royal_Group_700MW_power_plant__18.06.2019.pdf
Các từ khóa Power Plant,Preah Sihanouk,Royal Group,Coal-fired Power
Ngày đăng tải tháng 8 2, 2021, 04:08 (UTC)
Ngày chỉnh sửa, cập nhật tháng 2 7, 2022, 09:50 (UTC)