Đi thẳng đến nội dung

Webpage capture on the news article of​ the Bridge project tops out ahead of schedule

The successful topping out of The Bridge project, which involves the structure of the building reaching the highest point, was achieved on December 18, 2016, and was formally celebrated at a ceremony yesterday afternoon.

Data Resources (1)

Data Resource Preview - Webpage capture on The Bridge Cambodia

Thông tin khác

Miền Giá trị
Loại tài liệu Archived web content
Ngôn ngữ
  • Tiếng Anh
Chủ đề
  • Foreign investors
  • Investment
Vùng địa lý (phạm vi không gian)
  • Campuchia
Các (Tỉnh)
  • Phnom Penh
Bản quyền Yes
Hạn chế truy cập và sử dụng

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Phiên bản/Lần xuất bản 1
Giấy phép

No license given

Liên hệ

Phnom Penh Post

Mail address: The Elements Condominium, Level 7, Hun Sen Boulevard, Phum Tuol Roka III, Sangkat Chak Angre Krom, Khan Meanchey, 12353 Phnom Penh, Cambodia Tel: +855(0) 23 888 161 / 162 Fax: +855(0) 23 214 318 Khmer website: https://www.postkhmer.com/ English website: https://www.phnompenhpost.com/

Nơi xuất bản Phnom Penh Post
Ngày xuất bản 2017
Chú ý

Link to the archived webpage: https://archive.ph/KUa77

Văn bản pháp luật liên quan The_Bridge_Cambodia__11.01.2017.pdf
Các từ khóa The Bridge Cambodia,Foreign Investment
Ngày đăng tải tháng 3 28, 2022, 03:48 (UTC)
Ngày chỉnh sửa, cập nhật tháng 5 3, 2022, 10:12 (UTC)